After construction or renovation, a thorough final cleanup prepares your space for occupancy. Post-construction commercial cleaning removes construction dust and debris from surfaces, floors, fixtures, and glass so your newly finished Austin facility is move-in ready. This checklist covers what a final cleanup typically includes.
Construction leaves fine dust everywhere — on surfaces, in vents, and along baseboards. A final cleanup addresses all of it before move-in.
Dust Removal from Surfaces
Shelves, counters, fixtures, and horizontal surfaces are wiped down to remove construction dust. Vents and baseboards get attention so dust doesn't recirculate.
Floor Cleaning and Prep
Floors are swept, mopped, and prepped for finishing. Hard floors and carpet each need a different approach to remove construction debris.
Window and Interior Glass
Windows and interior glass are cleaned to remove dust, stickers, and residue so the space looks finished.
Fixtures and Hardware
Light fixtures, door hardware, and cabinet handles are wiped so every visible surface is clean.
Restrooms and Final Detailing
Restrooms are detailed — fixtures, mirrors, and floors — and final trash and debris are removed so the space is ready to occupy.
The goal of post-construction cleaning is simple: remove every trace of the build so the space is ready to use.
Timing and Coordination
Post-construction cleaning is scheduled after trades finish and before move-in. We coordinate timing with your contractor or project manager so the space is ready on schedule. It's typically a one-time project, often followed by a recurring janitorial program once you occupy.


